Case Study

Digital Edge Data Centre

Location : Airoli, Navi Mumbai

Scheme: Double Bus Configuration.
Capacity : Phase 1: 30 MVA
Voltage Level/Type: 100Kv GIS Substation

Value Proposition

  • Concept to Commissioning scope from Main Designs/ DD/ Detailed design of 100Kv Re-Routing of Overhead Line Including CTT Designs.
  • Build of Overhead 100Kv Monopole Towers Lattice Type Structures in reducing the Capex of the Tx Line.
  • Modifications to Existing Towers for Better Tap off Arrangements for Future Data Centres.
  • Complete End to End Solutions along with Permits and approvals from the Authority in Parallel to the execution
  • Completion of the Overall Project within the period desired in order to initiate Data Centre Construction

Scope: Design and Build 100Kv Incoming line Diversion with
Lattice type Structure in MMR region/

Voltage Level: 100Kv
Completion Period : 5 Months