Everyondr Data Centre Case Study
Everyondr Data Centre
Location : Turbhe, Navi Mumbai


Scheme: Double Bus Configuration.
Capacity : Phase 1: 60 MVA
Phase 2: 60 MVA
Voltage Level/Type: 220Kv GIS Substation
Value Proposition
- Concept to Commissioning scope from Main Designs/ DD/ Detailed design and Design and Build of 220/22Kv Substation.
- Build of Overhead 220Kv Monopole Towers instead of 220Kv EHV Cable eliminating the risk of Cable damage in public Domain.
- Design and Build of Monopole Structure with 3.5 Mtr Dia to avoid excessive congestion in MMR Region.
- Single Sided Designs of Monopoles for Clearance.
Stage 4 Designs at LOD 350 and Stage 5 Designs at LOD 450-500. - 4D Laser Scanning for determining Design and constructability
Scope: Design and Build 220Kv Incoming line with Monopole Structures in MMR region and D&B of 220Kv Substation Works
Voltage Level: 220/22Kv Substation
Completion Period : 16 Months