Sify Technologies Ltd – Case-Study
Sify Technologies Ltd.
Location : Rabale, Navi Mumbai

Scheme: Single Bus Configuration.
Capacity : Phase 1: 12.5 MVA
Phase 2: 25 MVA
Phase 3 :70 MVA
Voltage Level/Type: 132Kv Substation
Value Proposition
- Optimum Land Utilization.
- 1Stop Capchem Solutions : Power Sanction, HV Switchgear, Installation, Integration and
Commissioning - Less Operational Cost.
- Tubular Rigid Busbar Design increasing Life of Equipment.
- Seamless Utility Integration.
- Transmission line from Forest Approvals with special duck down tower.
- Handover in 11 Months.

Scope: Power Sanction,Supply, Installation, Testing and
Commissioning, Power Release,Including Civil Works on Turnkey
Basis.
Voltage Level: 132/22Kv Substation
Completion Period : 11 Months