Sify Technologies Ltd – Case-Study

Sify Technologies Ltd.
Location : Rabale, Navi Mumbai

Scheme: Single Bus Configuration.
Capacity : Phase 1: 12.5 MVA
Phase 2: 25 MVA
Phase 3 :70 MVA

Voltage Level/Type: 132Kv Substation

Value Proposition

  • Optimum Land Utilization.
  • 1Stop Capchem Solutions : Power Sanction, HV Switchgear, Installation, Integration and
    Commissioning
  • Less Operational Cost.
  • Tubular Rigid Busbar Design increasing Life of Equipment.
  • Seamless Utility Integration.
  • Transmission line from Forest Approvals with special duck down tower.
  • Handover in 11 Months.

Scope: Power Sanction,Supply, Installation, Testing and
Commissioning, Power Release,Including Civil Works on Turnkey
Basis.
Voltage Level: 132/22Kv Substation
Completion Period : 11 Months